are carried out primarily to control runoff, wind velocity and erosion and to harvest rainwater
often require substantial inputs of labour or money when first installed
are often aligned along the contour/against prevailing wind direction
are often spaced according to slope
involve major earth movements and/or construction with wood, stone, concrete etc.
The structural measures implemented in DESIRE were
terrace (bench)
terrace (sloping)
land reclamation (dam)
freshwater to wash saline soil
drip irrigation
water harvesting
gully control
What measures were implemented in which study sites?
Notes:
Look up table v.4Oct11
Source for definitions: Liniger et al. 2008. A framework for documentation and evaluation of sustainable land management technologies. WOCAT/CDE/FAO/ISRIC
More details ...
Read an overview of the monitoring strategy and implementation of field experiments
The DESIRE project was co-funded by the European Commission, Global Change and Ecosystem.
DESIRE brought together the expertise of 26 international research institutes and non-governmental organisations. This website does not necessarily represent the opinion of the European Commission. The European Commission is not responsible for any use that might be made of the information contained herein.