Site Implementation Plan blueprint Print

To ensure comparability between the results of the soil and water conservation field trials, a blueprint was developed for all the site implementation plans.

 

Content

  • General: location of the monitoring plots
  • Summary: brief summary of the problems at this particular location and the SWC chosen, summary from Research Theme 3
  • Location description: soil type, relief, climate and photo's of the plot/field area
  • Stakeholder info: name, level of technology applied on this location
  • Land use: crop, rotation, grazing practice etc.
  • Conservation measures and experimental setup: short description of SWC measures, experimental setup, plot layout, situation map
  • Monitoring activities
  • Timetable of activities
  • Analysis strategy

 

More details ... download the full document

iconWP4.1 Site Implementation Plan: blueprint [0.82 MB]