One time measurements
- Dung mixing tank volume.
- Size of digester.
- Collection tank size/volume.
- A daily assessment of energy consumed for biogas and fuel wood. This is done for two period of 14 days: once in winter (June/July) and once in summer (October/November) for the pilot families (i.e. both biogas-using and control families).