Participation of stakeholders in the Rendina study site was found to be a difficult issue. It was felt by the CNR, the study site team, that stakeholders had become "participation-tired" and were therefore not interested in participating in further workshops. This was because, early in 2007, a lot of initiatives against desertification had been realized by different entities (manly institutional) which placed a lot of pressure on the second level stakeholders (farmers). CNR was of the opinion that the consultation process through Stakeholder Workshops 1 and 2 being adopted in other study sites, would not work here.

 

However, CNR succeeded in establishing some links with stakeholders, despite their early skepticism, but had had to follow a different strategy from the other study sites regarding holding Stakeholder Workshops 1 and 2. Instead, CNR organized two formal meetings with stakeholders.

 

More details ...
»Selecting strategies: Stakeholder Workshop 2 methodology and summary results from all study sites

 

 
WP3_1_Marmora_6.jpg.jpg

Acknowledgement

fp6 logo 3 50 x 43
The DESIRE project was 
co-funded by the
European Commission,
Global Change and
Ecosystem.
DESIRE brought together the expertise of
26 international research institutes
and non-governmental organisations.
This website does not necessarily
represent the opinion of the
European Commission. The European
Commission is not responsible for
any use that might be made of the
information contained herein.

Follow us