Zeuss Koutine, Tunisia
The four phase methodology that links the »Research themes was followed in Zeuss Koutine, producing results that are specific to this study site.
|
|||||||||||||||||||||||
Study sites
Acknowledgement
The DESIRE project was
|
DESIRE brought together the expertise of
26 international research institutes
and non-governmental organisations.
This website does not necessarily
represent the opinion of the
European Commission. The European
Commission is not responsible for
any use that might be made of the
information contained herein.